King Air Parts and Maintenance
We deliver FAA 8130-3 certified airworthy parts for King Air aircraft.
AAI is an industry leading King Air maintenance facility offering inspection, rapid repair, and overhaul services for the entire fleet of King Air aircraft.


King Air Models & Variants
The King Air family includes several model groups, each built for a different mission. These aircraft vary in size, payload, and mission, but share a maintenance reality: every functional part and system outlined below is built to the same rigorous inspection standard across the King Air lineup, with only minor variation in geometry and attachment points by series.
AAI supports maintenance across nearly the entire lineup:

Kevin Allen
President and CEO at AAI
Kevin Allen is CEO of Aircraft Accessories International, an FAA- and EASA-certified repair station in Georgia that overhauls and exchanges hard-to-find accessories and landing gear for general and business aviation aircraft. Since AAI’s founding in 2013, the company has focused on fast turnaround, transparent pricing, and certified parts that get grounded aircraft flying again.
King Air Intro
The Beechcraft King Air has spent more than 60 years earning a reputation for ruggedness and versatility across private, charter, medevac, and fleet operations.
Keeping one flying depends on a handful of interconnected systems: landing gear, wheel & brake, fuel, electrical, hydraulic, mechanical, and pneumatic. Each has its own parts, wear points, and maintenance intervals.
At Aircraft Accessories International (AAI), we work on King Air aircraft components every day as an FAA and EASA Part 145 repair station. This guide walks through the King Air models AAI supports and what owners, mechanics, and fleet operators should know about maintaining each of the aircraft's core systems.

AAI's Expertise in King Air
It is important to select a shop that has direct expertise in the part you need serviced. At AAI, we've invested in building our King Air parts inventory, training our technicians, and developing in-house expertise. When we work on your King Air parts, you're getting top quality service with no shortcuts.
King Air Landing Gear Services

King Air Landing Gear
King Air Landing Gear Inspection Requirements
King Air landing gear requires a major inspection every 8,000 cycles or 6 years, whichever comes first. A 6-year inspection includes the removal of the main gear assemblies, main gear drag braces, nose gear, and nose gear drag brace for full teardown. Though Beechcraft calls this an “inspection,” performing it correctly requires a full overhaul-level process: disassembly, stripping, cleaning, visual/dimensional/non-destructive inspection, machine shop repair (as needed), reassembly, testing, and an FAA Form 8130-3 certificate.

King Air Landing Gear 6-Year Inspection and Overhaul (MRO Guide)

Common Landing Gear Inspection Findings
Common findings include worn bushings, out-of-tolerance bores, chrome damage, and corrosion or cracking in high-load areas. AAI typically completes a King Air landing gear overhaul in 20-30 days.
Landing Gear Repair Services
Inroughly 90% of cases, AAI can repair rather than replace a landing gearcomponent.Repairs are completed using an existing or newly engineered FAA-approved specialized repair, and more than 50 of these are already on file specifically for King Air (oversized bushing repairs, piston re-chrome, axle journal restoration, trunnion bore repair, and more).
King Air Wheel and Brake Parts and Services
Wheel and brake assemblies take direct impact on every landing and are among the parts AAI overhauls and exchanges for King Air aircraft.
Wheel and Brake Content - Coming Soon!
Stay tuned – we’ll be producing future videos and articles about brake wear indicators, wheel assembly inspection intervals, and AAI's repair-or-replace process.
King Air Fuel System Parts and Services
King Air Fuel Pumps
Every King Air relies on two fuel pumps: an engine-driven pump as the primary source and an electric pump as a secondary/backup. Common designs include centrifugal boost pumps (which supply and back up the engine-driven pump and can transfer fuel tank to tank) and vane-type pumps (constant-displacement pumps used as both primary and auxiliary units).

Signs a Fuel Pump Needs Service
- Engine RPM fluctuations
- Fuel flow or pressure fluctuations
- Leaks or loose fittings
- Corrosion
Fuel Pump Repair Services
AAI overhauls fuel pumps from manufacturers including Lear Romec, Kelly Aerospace, Dukes, Parker Airborne, Rapco Fleet Support, Weldon, TCM Continental, and Precision Airmotive, plus King Air-specific parts like gate shutoff valves.
King Air Electrical System Parts and Services
King Air Electric Landing Gear Motor Inspection Requirements
Some King Air models use electric landing gear and flap motors. King Air is named alongside the Bonanza and Baron as one of three Beechcraft platforms using this design. A landing gear motor consists of a housing, armature, field assembly, bearings, brushes, and wires, and Beechcraft recommends a 2,000-hour time-between-overhaul.
Signs a Landing Gear Motor Needs Service
Watch for: a burning smell from the motor or wiring, loose wires or connections, and slower-than-normal gear retraction or extension speed.
Electric Motor Repair Services
AAI manufactures its own FAA-approved replacement brushes and offers armature/field assembly rewinding in-house, so the entire motor doesn't have to be scrapped.
Starter generators, blower controllers, flap motors, and solenoids round out AAI's King Air electrical capabilities.
King Air Hydraulic Parts and Services
Most King Air landing gear extension, retraction, and braking is hydraulically actuated (electro-mechanical retraction is limited to certain older models; see Electrical Systems above).
Hydraulic components AAI services on King Air aircraft include landing gear actuators, shimmy dampers, and MLG/NLG assemblies.
More Hydraulic Part Content Coming Soon!
King Air Mechanical Parts and Services
King Air Landing Gear Actuator Inspection Requirements
King Air landing gear actuators (also called landing gear gearboxes) and landing gear transmissions fall under AAI's mechanical capabilities. Per Beechcraft's requirements, the landing gear actuator end-play check is due every 1,000 cycles or 30 calendar months, and the actuator clevis hole must be inspected every 1,000 hours: standard practice during actuator overhaul when a part comes in to AAI.
Signs a Mechanical Actuator Needs Service
King Air aircraft also use trim tab and flap actuators as part of the flight control system, with wear typically concentrated in the external/internal screw, housing, sprockets, and bearings.
King Air Pneumatic Parts and Services
Pneumatic components on King Air aircraft include ice vane actuators and related de-ice/pressure system parts.
More Pneumatic Part Content Coming Soon!
Frequently Asked Questions
Which King Air models does AAI support?
Which King Air models does AAI support?
Nearly the full lineup, from the 90 Series through the 300 Series and 1900/99 Airliner family.
Does AAI repair or replace worn King Air landing gear parts?
Does AAI repair or replace worn King Air landing gear parts?
In about 90% of cases, AAI can repair using an existing or newly engineered FAA-approved specialized repair rather than replace the part outright.
How much does King Air landing gear overhaul cost?
How much does King Air landing gear overhaul cost?
Generally $20,000-$30,000, though AAI quotes standard-rate inspections and flags any 'above and beyond' repairs before proceeding.
How long does a King Air landing gear overhaul take?
How long does a King Air landing gear overhaul take?
Typically 20-30 days at AAI, depending on findings.
What's the difference between a King Air landing gear inspection and an overhaul?
What's the difference between a King Air landing gear inspection and an overhaul?
Beechcraft calls the six-year event an inspection, but performing it correctly requires a full overhaul-level process under FAA rules.
Why Do King Air Operators Choose AAI?
20-30 days typical king air landing gear inspection/overhaul turnaround
90% of King Air landing gear findings are repaired rather than replaced.
50% King Air-specific FAA-approved specialized repairs on file
2,000+ In-house overhaul capabilities across all airframes AAI supports
2,000+ in-stock rotable aircraft parts ready to ship

We make it easy to get the certified parts you need to get your plane back in the air.
1
Call AAI
Share your part number
2
Get a Quote
Clear pricing and timelines
3
Get Certified Parts FAST
Repair or exchange

Certified King Air Parts and Services
AAI is an FAA and EASA Part 145 repair station that overhauls and exchanges hard-to-find accessories and landing gear for most Beechcraft King Air models.
Actuators | Blower Controllers |
Brake Assemblies | Drag Brace Assemblies |
Flap Motors | Fuel Pumps |
Gate Shutoff Valves | Ice Vane Actuators |
Landing Gear | Landing Gear Gearboxes |
Landing Gear Motors | Landing Gear Transmissions |
MLG Assemblies | NLG Assemblies |
Shimmy Dampers | Solenoids |
Starter Generators | Wheel Assemblies |
Scheduled Maintenance for King Air Aircraft |
Landing gear inspection/overhaul: 8,000 cycles or six years |
Landing gear actuator end-play check: 1,000 cycles or 30 months |
Landing gear actuator clevis hole inspection: 1,000 cycles or 30 months |
Featured Content
Articles
Videos

Need help planning your next King Air 6-year landing gear inspection or overhaul?
AAI is here to help you find the problems, solve them efficiently, and get your aircraft back in the air, safely and confidently.




